Public Construction in East and West of Olympic Village
Time:2017-07-01 16:37Building types:Commercial buildings
Production:By 150 half hidden frame glass curtain wall. 30 mm thick dry hanging stone curtain wall, cantilever nearly 5 m of aluminum veneer canopy, the former layer containing glass curtain wall system
Address:The ao village
Finished time:1970-01
The project adopts the 150 semi-hidden frame glass curtain wall, 30mm thick dry hanging stone curtain wall, overhangs nearly 5m high aluminum veneer rainshed, and the anterior layer contains the glass curtain wall system, with total construction area of over 20,000m2. The floor is not high, but with diversified modeling, to highlight the building's generosity and magnificence.